From 2023 to today
What we have done each year since we opened the workshop.
To date, 144 boarding bridges at 44 airports and ports in 28 countries.
-
2023
We open the workshop in Montcada
We started building electrical panels for factories and looking after their installations so they never stop.
Industrial installations
Panel under assembly, Montcada workshop 
Drive panel, 2023 
Industry, 2023 
Airport, Spain, 2023 
Industry, 2023 
Airport, Spain, 2023
-
2024
Seven bridges for Brussels
We built seven boarding bridges in our workshop for Brussels Airport and got them running there.
Boarding bridges
Terminal strip of a control panel 
Workshop, 2024
-
2025
United Kingdom, Switzerland and France
We went abroad: new bridges at airports and ports in three countries.
Our projects
Port bridge, 2025 
Power connection, 2025 
Panel 
Industry, 2025
-
2026
This year
We keep working for factories, shops and data rooms, and we have six projects under way.

Supply trench, 2026 
Maintenance, 2026 
Airport, 2026 
Airport, 2026
What comes next
Recent projects
Tap a photo to see the job from the inside: what was asked, how it was done and what was installed.

Geneva Airport
Eleven passenger boarding bridges

Manchester Airport
Eleven new passenger boarding bridges
Port of Plymouth
Passenger boarding bridge for ferry traffic
Airtificial, machine assembly
Full electrical assembly of a machine