Gonvarri, Spain, 2023, energia
Gonvarri, charging points
Electric vehicle charging in bay 7
Job predating this website: no photo of our own yet
LocationGonvarri, Spain
Year2023
Type of workInstallation
Sectorenergia
What was asked
Electric car charging points for the staff of an industrial building, with their own supply, in 2023.
How it was done
We ran a dedicated line from the main board, with its protection and its containment to the car park. The chargers follow ITC-BT-52. We sized them around what the building already uses, so charging cars never takes power away from production.
What was installed
- Chargers to ITC-BT-52
- Supply and protections
- Containment to the car park
- Available power study
A similar job?We call you today
Recent projects
Tap a photo to see the job from the inside: what was asked, how it was done and what was installed.

Switzerland, 2025
Geneva Airport
Eleven passenger boarding bridges

United Kingdom, 2025
Manchester Airport
Eleven new passenger boarding bridges
Boarding bridges
United Kingdom, 2025
Port of Plymouth
Passenger boarding bridge for ferry traffic
Industry
Spain, 2024
Airtificial, machine assembly
Full electrical assembly of a machine