Boarding bridge docked to an aircraft, with its electrical panel and cable routing visible on the side
A docked bridge, with its panel in view.

Airport and seaport boarding bridges

Panels and control desks built and tested in the Montcada workshop, and commissioned on site. 144 bridges in 44 airports and seaports across 28 countries.

Services

Boarding bridge docked to an aircraft on the airport apron

Airport boarding bridges

The electrics and controls of the bridges passengers use to board the plane.

More detail

We do the electrical and control work on new and refurbished bridges. We commission them at the airport, with aircraft operating around us.

  • Airports
  • Commissioning
  • Work during operations
Port passenger bridge docked beside the quay

Seaport boarding bridges

The same bridges for cruise ships and ferries, built to stand the sea air.

More detail

We do the same bridge for cruise and ferry terminals. The panel and controls are built to work out in the open.

  • Ports
  • Cruise and ferry
  • Outdoor use
Stainless steel control desk on the workshop bench, with its push buttons and terminal strip

Panels and control desks

The bridges' panels and control desks, built and tested in Montcada before they travel.

More detail

We build the power and control panels and the desks in our Montcada workshop. We test them there before they travel.

  • Workshop build
  • Control desks
  • Tested before shipping
400 Hz power panel at the foot of a boarding bridge

400 Hz and pre-conditioned air

The power and air a plane receives while it is parked at the terminal.

More detail

We install the 400 Hz supply and the pre-conditioned air the aircraft gets on the ground, with their panel and their ducting.

  • 400 Hz
  • PCA
  • Containment
Explosion-proof junction box and sealed luminaire on their bracket, with the earthing bar and the yellow-and-green cable in view, at a port terminal

Hydrocarbon terminals

Electrical installations that must never spark, for ports that handle fuel.

See the service

Where we have worked

Work before 2023 is by the same workshop, assembly and engineering team, before ETEAL had its own name. Each dot is a country; its size, how many jobs. Drag the globe to spin it and tap a dot for detail. The globe stays still until you touch it.

Drag to spin · tap a dot
AirportsPortsOpen project in 2026

Standards for these services

The standards named on this page
  • ITC-BT-29

We work to these standards and hold the installer registrations. The full list, with the registrations and what each standard requires, is in Standards and registrations.

Standards and registrations

A new bridge or a refurbishment?Tell us the airport