
Geneva, Switzerland, 2025
Geneva Airport
Eleven passenger boarding bridges
LocationGeneva, Switzerland
Year2025
Type of workInstallation
SectorBoarding bridges
What was asked
Eleven passenger boarding bridges at Geneva Airport, in 2025. The airport had to keep running while we worked.
How it was done
We did the electrical and control work on all eleven bridges. We built the power and control panels in the workshop, and at the airport we fitted the desks and the wiring. We started them up one at a time: each stand was handed over tested before the next one began.
What was installed
- 11 passenger boarding bridges (PBB)
- Power and control panels
- Operator desks
- Stand-by-stand commissioning
A similar job?We call you today
Recent projects
Tap a photo to see the job from the inside: what was asked, how it was done and what was installed.

United Kingdom, 2025
Manchester Airport
Eleven new passenger boarding bridges
Boarding bridges
United Kingdom, 2025
Port of Plymouth
Passenger boarding bridge for ferry traffic
Industry
Spain, 2024
Airtificial, machine assembly
Full electrical assembly of a machine
Boarding bridges
Belgium, 2024
Brussels Airport
Seven passenger boarding bridges