The team on site in Geneva.
Geneva, Switzerland, 2025

Geneva Airport

Eleven passenger boarding bridges

LocationGeneva, Switzerland
Year2025
Type of workInstallation
SectorBoarding bridges

What was asked

Eleven passenger boarding bridges at Geneva Airport, in 2025. The airport had to keep running while we worked.

How it was done

We did the electrical and control work on all eleven bridges. We built the power and control panels in the workshop, and at the airport we fitted the desks and the wiring. We started them up one at a time: each stand was handed over tested before the next one began.

What was installed

  • 11 passenger boarding bridges (PBB)
  • Power and control panels
  • Operator desks
  • Stand-by-stand commissioning