Programmable logic controller inside the control panel.
Manchester, United Kingdom, 2025

Manchester Airport

Eleven new passenger boarding bridges

LocationManchester, United Kingdom
Year2025
Type of workInstallation
SectorBoarding bridges

What was asked

Eleven new passenger boarding bridges at Manchester Airport, in 2025, with the airport in operation.

How it was done

We built and tested the power and control panels in our workshop. At the airport we fitted the control desks, one PLC per bridge and the wiring. We worked stand by stand, at the pace of the airport's operations, and each one went back into service as soon as it was tested.

What was installed

  • 11 passenger boarding bridges (PBB)
  • Panels built and tested in the workshop
  • One PLC per bridge
  • Operator desks
A similar job?We call you today