Gonvarri, Spain, 2023, Industry
Gonvarri, shearing line
Power and control panel for the line
Job predating this website: no photo of our own yet
LocationGonvarri, Spain
Year2023
Type of workInstallation
SectorIndustry
What was asked
A new panel for the shear line of a steel processing plant, in 2023.
How it was done
We built the power and control panel in our workshop, to EN 61439 and the IEC 60204-1 machine safety standard. At the plant we did the supply, the wiring and the connections, and commissioned it with the line stopped for as short a time as possible.
What was installed
- Power and control panel
- EN 61439
- Machinery safety IEC 60204-1
- On-site commissioning
A similar job?We call you today
Recent projects
Tap a photo to see the job from the inside: what was asked, how it was done and what was installed.

Switzerland, 2025
Geneva Airport
Eleven passenger boarding bridges

United Kingdom, 2025
Manchester Airport
Eleven new passenger boarding bridges
Boarding bridges
United Kingdom, 2025
Port of Plymouth
Passenger boarding bridge for ferry traffic
Industry
Spain, 2024
Airtificial, machine assembly
Full electrical assembly of a machine