Inside a cleanroom with sealed recessed luminaires in the ceiling, airtight switches on the wall and surface conduit on spaced supports

Laboratories and cleanrooms

We do the electrical installation for laboratories and cleanrooms, the rooms where the air is filtered and dust must stay out. Everything is sealed, smooth and easy to clean. And we hand over the paperwork the room validation asks for.

What it covers

  • Cleanrooms
  • Sealed luminaire
  • Room validation
  • UNE-EN ISO 14644
01Sealed and smooth

Recessed sealed luminaires, airtight switches and sockets, smooth boxes. No corner is left where dust or cleaning water can collect.

02Conduit you can clean

We only leave conduit and tray exposed where it is allowed, standing off the wall and with no gaps. Everything else runs through the service ceiling.

03Protected power

Equipment sockets run from a UPS, batteries that keep the power on if the mains fails. So whatever is inside the room keeps working.

04In step with the room's air handling

We coordinate the installation with the room's air conditioning and pressure. They are what keep the air clean.

05Tests for validation

The room is validated by whoever certifies it, usually to UNE-EN ISO 14644 and, in pharma, GMP. We hand them the record of electrical tests they need.

Standards for this service

The standards named here
  • UNE-EN ISO 14644

The full list, with the registrations and what each standard requires, is in Standards and registrations.

Standards and registrations →

Do you need this for one of your installations?Tell us what is installed